Soo Locks Under Repair
ONE SMALL STEP FOR ENGINEERS, A GIANT LEAP FOR THE SAULT CANAL Engineers set foot in bottom of lock to begin inspections The lock was drained in just two days using three 50 hp pumps located in the historic site’s original powerhouse. The bottom of the lock is lined with wooden [Read more]