Posts Tagged ‘anemos energy’

Met Tower Successfully Installed +Videos/photos

Met Tower Successfully Installed +Videos/photos

Whatch for the met tower to come into sight at approximately 1minute 25 seconds. SCHREIBER, ON – November 15-17, a team from Anemos Energy Corporation worked to install a 50 m (164 ft) high, temporary,  meteorological assessment tower (MET) tower, made of  tubular steel tower, 50 m (164 [Read more]

Proposed Schreiber Wind Farm Update

Proposed Schreiber Wind Farm Update

SCHREIBER, ON – Schreiberites may have heard a helicopter over head yesterday and wondered what the activity was all about… These noisess  will continue through the day today as a 50 m (164 ft) high, temporary,  meteorological assessment tower (MET) tower, made of  tubular steel [Read more]

Lowest Gas Prices in Northshore AND Greenstone
Ontario Gas Prices provided by GasBuddy.com