I went out to the Black River bridge yesterday afternoon (august 26) to see how things were progressing and wether it was possible to cross if necessary. The photos below give a look at where the work is at, I am not a construction person nor am I an engineer but it did look to me like things were moving along quite rapidly. Work was being done at the opposite end of the bridge and looked like there was a significant peice which had been removed (I think). I did not ask if crossing was possible though if I had to make a guess it would be that it was not. I will try to ask when I go out for photos today, whether there is a schedule available regarding crossing opportunities.